Strelley Road Library

Project Summary

This project consisted of a new build timber frame super structure creating a public library and 37 apartments.

The duration of our works was 10 months with a value in excess of £1m.

GEDA Construction

Scope of Works

Full Design & Build M&E Installation

The disciplines included:

  • LV distribution.
  • Internal & External lighting.
  • General power.
  • Data/ phone systems.
  • Fire Alarm.
  • Intruder Alarm.
  • Access Control.
  • IRS (TV system).
  • Lightening protection.
  • PV system.
  • Hot & cold water distribution.
  • Centralized boiler plant.
  • Heat interface units.
  • CHP unit.
  • MVHR systems.
  • Air conditioning.
  • Sanitary Ware installations.
  • BMS system.
  • Sprinkler system.