Project Summary
This project consisted of a new build timber frame super structure creating a public library and 37 apartments.
The duration of our works was 10 months with a value in excess of £1m.
Scope of Works
Full Design & Build M&E Installation
The disciplines included:
- LV distribution.
- Internal & External lighting.
- General power.
- Data/ phone systems.
- Fire Alarm.
- Intruder Alarm.
- Access Control.
- IRS (TV system).
- Lightening protection.
- PV system.
- Hot & cold water distribution.
- Centralized boiler plant.
- Heat interface units.
- CHP unit.
- MVHR systems.
- Air conditioning.
- Sanitary Ware installations.
- BMS system.
- Sprinkler system.